

- Museum at Prairiefire
- Denver Union Station Transit Center
- Dennis Meas Justice Center - Pueblo County Judicial Center
- LeeTran Headquarters
- Vandenberg Hall, U.S. Air Force Academy
- Joseph R. Biden, Jr. Railroad Station
- Armed Forces Retirement Home (AFRH)
- NASA Johnson Space Center - Building 12
- Los Gatos Public Library
- Port of Nanaimo Cruise Ship Terminal
- Lindsey-Flanigan Courthouse
- Sarasota Police Headquarters
- Frontier Project
- Art Gallery of Alberta
- Atlanta Botanical Gardens - Allen and Gail Hardin Visitors Center
California Court of Appeal, Fifth Appellate District- Lawrence Berkeley National Laboratory - Molecular Foundry
- Sandler Center for the Performing Arts
- Homer Public Library
- University of Alaska Museum of the North
- San Jose Public Library - Cambrian Branch
- Southeast Division Police Station
- Curtis Culwell Center
- Missouri Department of Natural Resources - Lewis and Clark State Office Building
- DFW International Airport Terminal D
- Aquatic Center, 1996 Olympic Aquatic Venue
- Muttart Conservatory
- Alaska Islands and Ocean Visitors Center
- Statue of Liberty - Historic Window Replacement Project
Vandenberg Hall, U.S. Air Force Academy
Colorado Springs, Colorado, USA
Products Used:
1600 Wall System™1 Curtain Wall (blast and non-blast versions)
8400TL Horizontal Sliding Windows (blast version)
500 Heavy Wall™ Doors (blast version)
AA™3900 Sliding Doors (non-blast version)
Reynobond® ACM (Aluminum Composite Material) panels
Astronauts, Rhodes Scholars, professional athletes, an Olympic medalist,members of Congress – the portfolio of past residents at Vandenberg Hall on the campus of the U.S. Air Force Academy (USAFA) in Colorado Springs, Colorado reads like the guest list of a Hollywood party. But after years of weather and natural wear and tear, the building needed a major overhaul.Originally constructed in 1962, Vandenberg Hall houses 23 of the USAFA’s 40 squadrons. The building spans over a quarter mile in length and includes 226,000 square feet of living space. With a renovation of such magnitude, the USAFA decided to break the multi-year project into nine phases. Lantz-Boggio Architects, P.C. secured the design bid, and the team forged ahead with planning the remodel.
ARCHITECT
Lantz-Boggio Architects, P.C.
Englewood, Colorado, USA
GLAZING CONTRACTORS
RGI/EPG Joint Venture
Ryan Glass, Inc.
Colorado Springs, Colorado, USA
El Paso Glass
Colorado Springs, Colorado, USA
PANEL SUPPLIER
Elward Systems Corporation
Lakewood, Colorado, USA
Photography: ©CJBerg
Vandenberg Hall Project Profile [365KB]